• Western Wood Energy Plant, Port Talbot, UK

AET Biomass Power Plants

The AET Biomass Power Plant is designed for you who want to produce power and appreciate excellent and well-documented performance and availability.

Benefits for You

The benefits of an AET power plant include:

  • The high performing AET Biomass Boiler
    - High boiler efficiency
    - Low in-house power consumption
    - Low flue gas emissions
    High fuel flexibility - low operating cost
    - High combustion efficiency
    - Best Available Technology
  • High plant efficiency
    - Optimised heat balance
    - Good business case for you
  • High availability
    - Improved business case for you

Determining the optimal design for a biomass-fired power plant involves in many parameters such as optimum operating conditions, fuel, boiler, turbine, steam/water cycle etc.

AET can assist you in optimising the plant parameters as our expert staff have many years of experience and extensive knowledge of steam cycles and steam turbines.

 

AET Biomass Power Plant Parameters

AET Biomass Power Plants can be designed for almost all types of biomass. The high electrical efficiency, very stable electricity production and extremely high availability ensure a good business case for you as the investor. The design parameters below form the basic platform for our plants:

 

Fuel heat input

25 – 170 MWth

Net electrical power output

7 - 65 MWe

Net electrical efficiency

28 - 38%

Boiler design

Water tube boiler with natural circulation
Single pressure or double pressure (reheat, e.g. 140 bar and 25 bar)

Operating time

At least 8000 hours without shutdown for manual cleaning

Boiler efficiency

91% - 94%  - depending on fuel moisture

Emission values

Better than European requirements

Fuel flexibility

Fuel moisture content: 10 - 57%

Auxiliary burner

Not necessary

In-house power consumption

<2.5 % of fuel heat input

Availability

Better than 96,5%.

 

To see some of the AET Biomass Power Plants, click on the links below:

The Western Wood biomass power plant produces 15 MWe of electricity.

EPR Glanford (Fibrogen), Biomass Power Plant, Scunthorpe, UK.

AET power plants can be designed for almost all types of biomass.

www.aet-biomass.com
  //  Home   //  Products   //  Biomass Power Plants
  • Aalborg Energie Technik a/s
  • Alfred Nobels Vej 21F
  • DK-9220 Aalborg East, Denmark
  • Tel +45 96 32 86 00
  • aet@aet.dk