The Western Wood Energy Power Plant (WWEP) is a biomass fired power plant built and owned by Western Bio-energy Ltd.
The biomass power plant was successfully commissioned in 2008 - 18 days ahead of schedule. An initial performance test showed:
- The overall cycle efficiency was 30 %
- The boiler efficiency was tested to 92 %
- The in-house power consumption for the whole plant was only: 1150 kW
UK's higest availability at 99%
In 2009, a 6 month availability test has been conducted and the overall availability for the whole power plant showed impressive 99% (APR - OCT 2009).
The WWEP has an annual fuel heat input of 160,000 tons of forestry wood or clean, uncontaminated residues from wood processing.
Turnkey supply
The supply was made in a consortium between a partner and Aalborg Energie Technik a/s. AET designed, supplied, constructed and commissioned the following scope:
- Fuel storage and preparation
- AET fuel feeding and dosing system
- AET Combustion System with spreader stoker and AET-Biograte
- AET boiler with superheater and economizer
- AET over fire air system
- Steam air preheaters
- Feed water system
- Oil burner
- Ash handling system
- Bag filter
- Stack
- PCL control system and instrumentation
- SCADA system
- Piping and ducting
- Insulation
- Structural steel
- Platforms and stairs
- Heat balance optimisation
Further information
- Video from opening ceremony of WWEP: "AET plant operation with UK´s best availability", click here.
- AET together with the consortium partner also have an 5 year O&M contract for the project.
Questions? Need detailed information?
Please get more information about this biomass plant and/or generally about Aalborg Energie Technik a/s: Who is AET Biomass?
AET has capabilities in development, design, supply, construction, commissioning, operation & maintenance, rehabilitation and conversion of process steam plants, CHP-plants and power plants, fired with a wide range of biomass fuels such as wood chips, bark, demolition wood, wood waste, sander dust, chicken litter, spent compost, meat & bone meal, agricultural waste, grown biomass fuel a.m.
AET also offers consultancy services in the biomass and boiler field.
|
48 MWfuel heat input, 92 bara, 512°C
15 MWe

From the official opening ceremony: "AET plant operation with UK´s best availability". See the video.

This biomass power plant has a 48 MW AET Biomass Boiler with AET's newest combustion system and fulfils stringent NOx emission criteria without SNCR.

The Western Wood Energy Power Plant is a biomass fired power plant built and owned by ECO 2. |
 |
|