Biopower Power Plant, Germany

The BioPower Plant is a biomass fired heat and power plant whit a fuel input of 53.000 tons of wood chips, wood waste and demolition wood per annum. The plant was commissioned and completed in November 2004. AET a/s has as a turnkey supplier designed, supplied, constructed and commissioned the boiler plant.

Boehinger Ingelheim Pharma KG

The plant was originally built as a 100% travelling grate coal fired unit for supply of electricity and process heat to the pharmaceutical process and commissioned in 1983. In 2004 the boiler was re-commissioned after conversion to 100% biomass and equipped whit an AET combustion system. The plant is re-designed to burn demolition wood in accordance with the¬¬ German WID. 100% load is obtained to 14,4 tons per hour. In connection with the conversion, AET has designed, engineered, produced and supplied the plant.

Energi Randers A/S CHP Plant, Denmark

Energi Randers Production A/S serves 62.000 inhabitants in the city of Randers with electricity and district heating. The CHP station was commissioned in 1982 as a spreader stoker coal fired plant. The plant was retrofitted in 2002/2003 with a AET biomass injection port co-firing system. The plant now operates in co-firing mode with min. 25% coal and max. 75% biomass fuel or 100% coal in single mode The biomass system is designed for various granulated biomass products such as meat and bone meal, olive stones or shea nuts. AET handled the retrofit of the two boilers as a turnkey supply.

Kronoply Energieanlage 3, Germany

The Kronoply Plant is a biomass fired heat and power plant, with a fuel input of app. 130.000 tons of wood chips, wood waste, chipboard waste, bark, saw dust and sander dust, per annum. The plant was commissioned in year 2002. AET has acted as a turnkey supplier of the fuel handling, the boiler plant and the flue gas cleaning system.

KWK Gütersloh, Germany

The Gütersloh Plant is a biomass fired heat and power plant, with a fuel input of app. 120.000 tons of wood chips, wood waste, demolition wood, bark, saw dust and sander dust, per annum. The plant was commissioned in year 2000. AET has acted as a turnkey supplier of the fuel handling, the boiler plant and the flue gas cleaning system.

KWK Neumarkt, Germany

The Neumarkt Plant is a biomass fired heat and power plant, with a fuel input of app. 130.000 tons of wood chips, wood waste, demolition wood, railway sleepers, bark, saw dust and sander dust, per annum. The plant was commissioned in year 1997. The plant was built by the present AET staff in a former employment as a turnkey delivery

Linz-Mitte CHP Plant, Austria

The Linz Mitte CHP Plant is a biomass fired heat and power plant, with a fuel input of app. 70.000 tons of forestry wood waste, and other wood waste products, per annum. The plant was commissioned in year 2002. AET has acted as a turnkey supplier of the fuel handling, the boiler plant and the flue gas cleaning system.

Pannovosges Power Plant,

The Pannovosges plant is a biomass fired power plant that burns approx. 92,000 t/a of wood chips, chipboard waste, bark and sander dust. The plant was built by AET’s present staff at a previous employer. The plant was commissioned in 1994.

Western Wood Energy Plant

The Western Wood Energy Power Plant is a biomass fired power plant with a fuel heat input of 160.000 tons of forestry wood or clean, uncontaminated residues from wood processing, per annum. The plant is under construction and will be completed in 2008. As turnkey supplier Aalborg Energie Technik design, supply, construct and commission.