The Biopower Plant is a biomass fired heat and power plant which was built, owned and operated by the german sawmill Schneider Holz GmbH.
A major benefit from building the power plant was to eliminate the waste wood, which was produced at the sawmill every day.
The plant has an annual fuel input of 53.000 tons of wood chips, wood waste, and demolition wood.
Availability at 94%
The plant was completed and commissioned in 2004 and supplied within 15 months. In 2007 the whole CHP plant had an availability of app. 94%.
AET supply
As turnkey supplier Aalborg Energie Technik a/s designed, supplied, constructed and commissioned the following:
- AET fuel feeding and dosing system
- AET Combustion System Spreader Stoker with AET-Biograte
- AET boiler with superheater and economizer and flue gas air preheater
- AET over fire air system
- Feed water system
- Steam turbine
- Air cooled condenser
- Water treatment plant
- Ash handling system
- Flue gas cleaning
- Stack
- Electrical systems
- PCL control system and instrumentation
- SCADA system
- Piping and ducting
- Insulation
- Structural steel
- Platforms and stairs
Further information
- See also Schneider's homepage to see how much carbon dioxide is within timber, click here.
Questions? Need detailed information?
Please get more information about this biomass plant and/or generally about Aalborg Energie Technik a/s: Who is AET Biomass?
AET has capabilities in development, design, supply, construction, commissioning, operation & maintenance, rehabilitation and conversion of process steam plants, CHP-plants and power plants, fired with a wide range of biomass fuels such as wood chips, bark, demolition wood, wood waste, sander dust, chicken litter, spent compost, meat & bone meal, agricultural waste, grown biomass fuel a.m.
AET also offers consultancy services in the biomass and boiler field.
|
26 MWfuel heat input, 67 bara, 462°C
8 MWe
8 MWthermal

This biomass combined heat and power plant has a 26 MW AET Biomass Boiler. In 2007 the whole plant had an availability of app. 94%.

Erection of the Schneider Biopower project.

A 3D view of the AET Biomass Boiler. |
 |
|